翻訳と辞書
Words near each other
・ Velikonda Range
・ Velikonja
・ Velikooktyabrsky
・ Velikoustyugsky District
・ Velikov
・ Velikovo
・ Velikovo, Dobrich Province
・ Velikton Barannikov
・ Veliky
・ Veliki Dol, Sežana
・ Veliki Drenovac
・ Veliki Dubovik
・ Veliki Gaber
・ Veliki Gaj
・ Veliki Galijaš
Veliki Gložac Tunnel
・ Veliki Greben
・ Veliki Grđevac
・ Veliki Guber
・ Veliki Hrib
・ Veliki Izvor
・ Veliki Jasenovac
・ Veliki Jelnik
・ Veliki Jovanovac
・ Veliki Kablići
・ Veliki Kal, Ivančna Gorica
・ Veliki Kal, Mirna Peč
・ Veliki Kamen
・ Veliki Koren
・ Veliki Korinj


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Veliki Gložac Tunnel : ウィキペディア英語版
Veliki Gložac Tunnel

Veliki Gložac Tunnel ((クロアチア語:Tunel Veliki Gložac)) is one of 13 tunnels found on the Croatian A6 motorway route. It is long and consists of two tunnel tubes. It is located between Vrbovsko and Bosiljevo 2 interchanges. The tunnel is tolled within the A6 motorway closed toll collection system. There are no other toll plazas related to use of the tunnel. Construction of the tunnel was completed by Viadukt and Hidroelektra.〔(【引用サイトリンク】 url= http://www.viadukt.hr/en/projects/tunnels/tunnel-veliki-glozac-rijeka-zagreb-highway )
European Tunnel Assessment Program (EuroTAP), a tunnel safety assessment program supported by the European Commission, coordinated by FIA and led by German motoring club ADAC, tested Veliki Gložac Tunnel in 2008, when it achieved very good results—ranking among the four safest road tunnels in Europe.
==Construction==
Construction of Veliki Gložac Tunnel was started by Spie Batignolles and Mediteran Union Tunel. The construction works contract was cancelled in 2001, and the works were resumed by Viadukt and Hidroelektra in 2002 after a new contract was awarded to them. Similar timeline of events also went on in case of Javorova Kosa and Podvugleš tunnels. The first, tunnel tube of Veliki Gložac Tunnel was excavated by Spie Batignolles and Mediteran Union Tunnel on August 29, 2000, while the second, somewhat longer, tube was excavated by Viadukt and Hidroelektra on November 25, 2005.
Construction of the second tunnel tube was particularly complex due to proximity of the first tunnel tube excavated in five years earlier. Since axes of the two are merely apart, and an oil pipeline runs nearby, blasting entailed special precautions. Since the first tunnel tube was already in use, traffic had to be suspended three times a day to allow progress of the works. Initial blast yield was lower and then gradually increased in order to achieve optimum results while maintaining safety. Finally, noise and oscillations of the first tunnel tube and the oil pipeline were constantly monitored to detect any sign of damage. Rock blasting started on June 9, 2005 and lasted until August 15, 2005, with more than 220 charges fired. At each of those times, traffic through the first tunnel tube was suspended for safety reasons.〔 The first tube of the tunnel, now carrying southbound traffic, is further characterized by the fact that it comprises three traffic lanes instead of standard two traffic lanes.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Veliki Gložac Tunnel」の詳細全文を読む